Skip to main content
Select a text block on the canvas or in Properties → Layers. A text block keeps its source text, its translation, the mask over its source glyphs, and its clean-up together, so you can correct OCR without rebuilding the text box.

Correct the text

Expand a text block’s row in the layer list to edit it. Edit Source text when OCR is wrong. Edit Translation for meaning, tone, names, or line breaks. A field commits when it loses focus. With the Text tool, select a text block or text layer on the canvas to type its translation in place. Click away or press Ctrl+Enter to commit; Escape leaves the text as it was.
Koharu draws translations only. A block without a translation shows its clean-up but no text, and source text never appears on the canvas or in exports.

Manage layers

The layer list shows the page’s tree frontmost first: panels, balloons, text blocks, text, rasters, and other layers, nested as they are. Select several with Ctrl, Command, or Shift, or with Edit → Select All Layers. Each row can show or hide, lock or unlock, and move its layer up or down among its siblings; an expanded row sets opacity and deletes the layer with everything inside it. Deleting a text block removes its clean-up too, so the original lettering shows again. A locked layer cannot be moved, and detection leaves it in place on a rerun.

Review a page

1

Check detection and OCR

Verify the text blocks, then correct source recognition errors.
2

Review the translation

Check meaning, tone, terminology, and names against the source.
3

Inspect the artwork

Look for remnants of source lettering and damage around cleaned areas.
4

Check the reading experience

Adjust typography, then inspect the page at normal reading size.

Undo and redo

Use Edit → Undo or Redo. The defaults are Ctrl+Z and Ctrl+Shift+Z on Windows/Linux, or Command+Z and Command+Shift+Z on macOS. Each page-stage result that a run writes is its own undo step, so undoing a project run takes one step per page and stage. History keeps the 20 most recent steps and is cleared when the project closes.